Navajo Tribal Utility Authority will construct, operate, maintain, and eventually decommission, a 5-Megawatt hour (MWh) [AC] Solar and 40 MWh Battery Storage Facility over a span of a 52- acre site.
Environmental Assessment - April 2026
Navajo Tribal Utility Authority will construct, operate, maintain, and eventually decommission, a 5-Megawatt hour (MWh) [AC] Solar and 40 MWh Battery Storage Facility over a span of a 52- acre site.
Environmental Assessment - April 2026