Mondovi Solar Project

The Project is a proposed 3-megawatt solar photovoltaic facility located on a parcel that has been previously disturbed for agriculture activities. The Project is located in the Town of Mondovi, Buffalo County, Wisconsin.

Staff Assignment Name: Alan Hachey
Project Submittal Date: 1 2/17/24
Project Approval Date: 2/13/25
DOE CE Applied: B5.16

Lowery Road Solar Project

The proposed project is a proposed 4.99 megawatt solar photovoltaic facility located on a parcel that has been previously disturbed for agriculture activities. The Project is located in the Town of Barre, Washington County, Vermont.

Staff Assignment Name: Maria Tur
Project Submittal Date: 11/22/24
Project Approval Date: 2/11/25
DOE CE Applied: B5.16

Spooner Solar Project

The proposed project is a 2.25 megawatt solar photovoltaic facility located on a parcel in the City of Spooner, Washburn County, Wisconsin. A portion of the Project area was previously used as a storage/borrow site for winter road sand and gravel. The site is otherwise vacant, industrially zoned land which is adjacent to an existing solar array.

Staff Assignment Name: Maria Tur
Project Submittal Date: 11/22/24
Project Approval Date: 2/11/25
DOE CE Applied: B5.16

Whitewater Solar Project

Brief Project Description: Stage Moose Solar, LLC proposes to construct the Whitewater Solar Project (Project), a  2-megawatt solar photovoltaic facility located on a parcel in the Southwest Quarter of Section 3, Township 108 North, Range 11 West, Town of Plainfield, Wabasha County, Minnesota.  The current site is an open field that has been previously disturbed for agriculture activities and therefore, would require minimal grading. The disturbance of land would be limited to the approximately 15-acre Project area during construction.

Castle Rock Lake Solar Project

Brief Project Description: The Project area is currently fallow land which will require minimal grading.  According to historical aerial imagery, the Project Area was used for agricultural and timber production until approximately 2012, when the parcel was cleared of vegetation. Since then, the Project Area has remained fallow land. The disturbance of land would be limited to the approximately 20-acre Project area during construction.

Project Submittal Date: DEC  2024
Project Approval Date: JAN2025
DOE CE Applied: B5.16