Smooth Drive for All in the City
Pawnee City had 3.8 miles of streets composed of asphalt or rock and deteriorated to the point repair was no longer feasible. With minimal to no curbing, the majority of drainage was in open ditches along the roadway. Complete replacement was necessary for safe streets in this area of the City.
Using the design provided by a Consulting Engineer firm, Rural Development was able to help the City identify the necessary financing to bring the streets back to new, smooth drivable surfaces.