The following waiver requests have been received by WEP and are open for a 15-day public comment period. Once the public comment period has closed the waiver will be reviewed by WEP.
Waiver Requests
None at this time.
Approved Waivers
- 6” Double Check Valve Backflow Preventer | Eastern Iowa Regional Utility Service Systems (Approved October 25, 2023)
- 4-inch Double Check Valve device | Water System Improvements; Murdock, MN (Approved August 23, 2023)
- 4-inch Ductile Iron Backup Rings | Wastewater Treatment Plant; Homedale, ID (Approved June 22, 2023)
- 3-inch RPZ (reduced pressure zone) device | Wastewater Treatment Facility; Camden, ME (Approved May 26, 2023)
- 4-inch RPZ (reduced pressure zone) device | Water Treatment Plant; Elizabeth, MN (Approved May 26, 2023)
- 2”-18” Ductile Iron Back-up Rings | Rigby Wastewater Treatment Plant, Idaho (Approved March 20, 2023)
- 1-1/4” combination curb stop and check valve assemblies (Approved December 8, 2022) | Eastern Iowa Regional Utility Service Systems, Petersburg, IA
- 6-inch backflow preventers | Southwestern Bartholomew Water Corporation, Columbus, IN (Approved August 24, 2022)
- 24”x16” Ductile Iron Restrained Joint Reducer | Southern Iowa Rural Water Association, Creston IA, (Approved July 26, 2022)
- Stainless Steel Fittings and Ball Valves | Public Wholesale Water Supply District No. 23, Fredonia, KS (Approved June 28, 2022)
- 6-inch RPZ (reduced pressure zone) device | Edgar, NE (Approved April 15, 2022)
- Small-bore stainless-steel pipe and fittings | South San Luis Obispo County Sanitation District, CA (Approved April 6, 2022)
- Restrained couplings to connect 8” ductile iron to SCH40 stainless steel | Horton, KS (Posted February 22, 2022)
- 16-inch butterfly valves, 16-inch check valves and 12-inch check valves | Milford City, UT (posted October 25, 2021)
- Pressure Lateral Kit | Bridgton, ME (Posted July 26, 2021)
- Pre-Engineered Metal Building (PEMB) | Antonito, CO (Posted June 10, 2021)
- Gate Valves and Swing Check Valves | Dade County, GA (posted May 17, 2021)
- Pig iron and Direct Reduced Iron (posted March 12, 2019)
Denied Waivers
None at this time.
Expired Waivers
- Stainless Steel Nuts and Bolts (expired February 24, 2020)
Contact us to ask a question, provide feedback, or report a problem.
Item | Type of Waiver | State | Assistance Recipient | WEP Program | Date |
---|---|---|---|---|---|
Pressure Lateral Kit | Availability | Maine | Bridgton, ME | Water & Waste Disposal (WWD) Loan & Grant | July 26, 2021 |
Pre-Engineered Metal Building (PEMB) | Availability | Colorado | Town of Antonito | Water & Waste Disposal (WWD) Loan & Grant |
June 10, 2021 |
Gate Valves and Swing Check Valves | Availability | Georgia | Dade County | Water & Waste Disposal (WWD) Loan & Grant | May 17, 2021 |