Telecommunications
Instructions for Preparing Financial and Statistical Reports for Telecommunications Borrowers (3/5/01)
LinkSpecifications for digital, stored program controlled central office equipment (Form 522) (1/23/1996)
LinkRUS Form 515a - Specifications and Drawings for Construction of Direct Buried Plant (.pdf includes drawings) (9/30/10)
LinkRUS Form 515b - Specification and Drawings for Construction of Underground Plant (.pdf includes drawings) (8/21/01)
LinkRUS Form 515c - Specifications and Drawings for Construction of Aerial Plant (.pdf includes drawings) (8/21/01)
LinkRUS Form 515d - Specification and Drawings for Service Installation at Customer Access Locations (.pdf includes drawings) (8/21/01)
LinkAcceptance Tests and Measurements of Telecommunications Plant (.pdf includes drawings) (8/26/1997)
Specifications for Filled Telephone Cables with Expanded Insulation (PE-89) (6/4/1993)
LinkSpecifications for Outside Plant Housings and Serving Area Interface System (PE-91) (.pdf includes drawings) (7/3/1996)
Standards for Splicing Copper and Fiber Optic Cable (PC-2) (.pdf includes drawings) (3/3/1995)
Minimum Performance Specification for Fiber Optic Cables (For Backbone, Feeder and Distribution Plant)(PE-90a) (12/22/09)
Minimum Performance Specifications for Filled Fiber Optic Cables (Subscriber Drop Cables) (12/22/09)
LinkService Installations at Customer Access Locations (PC-5A) (.pdf includes drawings) (9/11/01)
LinkAcceptance of Standards, Specifications, Equipment Contract Forms, Manual Sections, Drawings, Materials and Equipment for the Telephone Program (10/8/1981).
Provisions for the inclusion of Rural Telephone Bank - Sale of Property by Telephone Borrowers (8/31/1960)
Electric
Guide for Preparing Financial and Statistical Reports for Electric Distribution Borrowers (2/14/02)
LinkGuide For Preparing Financial and Statistical Reports For Power Supply Borrowers and Electric Distribution Borrowers with Generating Facilities (5/12/06)
LinkReduced Size Neutral Conductors for Overhead Rural Distribution Lines (revised 9/23/1999)
LinkGuide Specification for Prestressed Concrete Poles and Concrete Pole Structures (8/19/16)
LinkGuide Specification for Standard Class Prestressed Concrete Transmission Poles (7/27/16)
LinkProcurement and Application Guide for Non-Ceramic Composite Insulators, Voltage Class 34.5 kV and Above (5/9/17)
LinkElectric Transmission Guide Specifications and Drawings for Steel Pole Construction - 34.5 to 230 kV (5/7/19)
LinkElectric Transmission Guide Specifications and Drawings for Concrete Pole Construction - 34.5 to 230 kV (5/7/19)
LinkInterruption Reporting and Service Continuity Objectives for Electric Distribution Systems (3/24/09)
LinkSpecifications and Drawings for 34.5/19.9 kV Distribution Line Construction (11/20/1984)
Program Accounting
Water and Environmental
Water and Waste Facility Loans and Grants to Alleviate Health Risks Project Selection Criteria
LinkWater Programs Emergency and Imminent Community Water Assistance Grants Project Selection Criteria (1/27/14)
LinkWater Programs Emergency and Imminent Community Water Assistance Grants Transmittal Memorandum to Request Funds (1/27/14)
LinkLetter For Use In Informing Private Lender of Agency's Commitment (Bonds) (Revised 3-20-00)
Preliminary Engineering Reports for the Water and Waste Disposal Program (9/4/25)
Guidance for the Use of Engineers Joint Contract Documents Committee (EJCDC) Bidding and Contract Documents on Water and Waste Disposal Projects with Rural Utilities Service Financial Assistance (Revised 5/10/24)
Memorandum of Agreement between the Appalachian Regional Commission and the Rural Utilities Service
Guidance for Conducting Value Engineering Studies for Water and Waste Projects (Effective 3-21-2005)
LinkGuidance for Using the Competitive Sealed Bids Process for the Water and Waste Disposal Program (Effective 9-5-2013)
LinkGuidance for the Implementation of American Iron and Steel (AIS) Requirements with Rural Utilities Service Financial Assistance (Effective 8-30-2017)
Link