Minnkota Power Cooperative proposes the construction of a CO2 storage facility and its infrastructure at the existing Milton R. Young coal-fired power plant in Oliver County, North Dakota The project consists of the carbon capture facility, a 0.5-mile-long CO2 flowline; Class VI injection wells (up to three); Class I disposal wells (up to two); one underground source of drinking water (USDW) monitoring well; and deep subsurface monitoring wells (up to two).
Project Tundra
Minnkota Power Cooperative, Inc.