Project Description: T The project will provide a Renewable Energy Resource (RER) system and Energy Storage System (ESS) which will generate clean, renewable solar energy. The ESS will allow for load balancing and system support during peak demand periods. The renewable energy resource will consist of two megawatts of Solar photovoltaic (PV) connected to a Battery Energy Storage Systems (BESS) with the capacity to provide 1 megawatt of power for 4 hours. The RER and connected BESS will utilize Tier 1 Bifacial Modules as well as string inverters and the BESS batteries will be Lithium iron phosphate.
Area Footprint (in acres) – In total, the Project area encompasses approximately 20.3 acres. The planned fenced in area to support the solar and energy storage equipment is approximately 10.5 acres. Of the 10.5 fenced in acres, the solar panels will be arrayed across approximately 8.5 acres.
Project Submittal Date: March 2025
Project Approval Date: 7/29/25
DOE CatEx Applied: B5.16