Electric
Guide to Federal Financing Bank Loans guaranteed by RUS
Sale or Transfer of Capital Assets by Electric Borrower (8/3/23)
Voltage Regulator Application on Rural Distribution Systems (7/4/17)
Design Guide for Sectionalizing Distribution Lines (10/23/2012)
Reduced Size Neutral Conductors for Overhead Rural Distribution Lines (revised 9/23/1999)
Unguyed Distribution Poles - Strength Requirements (08/14/14)
Mechanical Loading on Distribution Crossarms (2/23/16)
The Mechanics of Overhead Distribution Line Conductors (7/30/03)
Electric Distribution Line Guys and Anchors (4/25/01)
Distribution Conductor Clearances and Span Limitations (7/30/03)
Design Manual for High Voltage Transmission Lines (12/2/15)
Guide for upgrading transmission lines (2/01/16)
Guide Specifications for Steel Single Pole and H-Frame Structures (4/9/19)
Design guide: Embedment depths for concrete and steel poles (5/2/17)
Guide Specification for Prestressed Concrete Poles and Concrete Pole Structures (8/19/16)
Guide Specification for Standard Class Steel Transmission Poles (4/9/19)
Guide Specification for Standard Class Prestressed Concrete Transmission Poles (7/27/16)
Procurement and Application Guide for Non-Ceramic Composite Insulators, Voltage Class 34.5 kV and Above (5/9/17)
Electric Transmission Guide Specifications and Drawings for Steel Pole Construction - 34.5 to 230 kV (5/7/19)
Electric Transmission Guide Specifications and Drawings for Concrete Pole Construction - 34.5 to 230 kV (5/7/19)
Design Guide for Rural Substations (6/07/01)
Guide for the Evaluation of Large Power Transformer Losses (3/4/09)
Design guide - oil spill prevention and control at substations (1/14/08)
Specification for Wood Poles, Stubs and Anchor Logs (4/18/22)
Assembly Unit Numbers and Standard Format (10/16/24)
Specifications and Drawings for 24.9/14.4 kV Line Construction (12/15/98)
Depreciation Rates and Procedures
Specifications and Drawings for 34.5/19.9 kV Distribution Line Construction (11/20/1984)
Telecommunications
Guide to Federal Financing Bank Loans Guaranteed by RUS (2/24/1998)
Instructions for Preparing Financial and Statistical Reports for Telecommunications Borrowers (3/5/01)
Underground Plant Design (includes drawings) (8/28/02)
Underground Plant Construction (includes drawings) (Update 8/28/02)
Specifications for digital, stored program controlled central office equipment (Form 522) (1/23/1996)
Telecommunications Software License Agreement (4/26/1994)
Specifications and Drawings for Underground Electric Distribution (11/7/1996)
RUS Form 515a - Specifications and Drawings for Construction of Direct Buried Plant (.pdf includes drawings) (9/30/10)
RUS Form 515b - Specification and Drawings for Construction of Underground Plant (.pdf includes drawings) (8/21/01)
RUS Form 515c - Specifications and Drawings for Construction of Aerial Plant (.pdf includes drawings) (8/21/01)
RUS Form 515d - Specification and Drawings for Service Installation at Customer Access Locations (.pdf includes drawings) (8/21/01)
Acceptance Tests and Measurements of Telecommunications Plant (.pdf includes drawings) (8/26/1997)
Specifications for Aerial Service Wires (PE-7) (8/22/1996)
Specification for Filled Telephone Cable (PE-39) (6/4/1993)
Specifications for Filled Buried Wire (PE-86) (1/14/1994)
Specifications for Terminating Cables (PE-87) (7/14/1994)
Specifications for Filled Telephone Cables with Expanded Insulation (PE-89) (6/4/1993)
Specifications for Outside Plant Housings and Serving Area Interface System (PE-91) (.pdf includes drawings) (7/3/1996)
Standards for Splicing Copper and Fiber Optic Cable (PC-2) (.pdf includes drawings) (3/3/1995)
Minimum Performance Specification for Fiber Optic Cables (For Backbone, Feeder and Distribution Plant)(PE-90a) (12/22/09)
Minimum Performance Specifications for Filled Fiber Optic Cables (Subscriber Drop Cables) (12/22/09)
Service Installations at Customer Access Locations (PC-5A) (.pdf includes drawings) (9/11/01)
REA Work Order Procedure (7/16/1992)
Part 32, Uniform System of Accounts and Supplementary Accounts (11/12/1992)
Fedwire Deposit System Wire Message Format (9/1/1982)
Acceptance of Standards, Specifications, Equipment Contract Forms, Manual Sections, Drawings, Materials and Equipment for the Telephone Program (10/8/1981).
Revised Page in REA Specifications PE-52 (8/7/1972)
REA Specification for Filled Splice Closures (10/18/1985)
Specifications for Carbon Arrester Assemblies for Use in Protectors, PE-78 (5/4/1980)
Specification for Gas Tube Surge Arresters, PE-80 (7/1979)
Provisions for the inclusion of Rural Telephone Bank - Sale of Property by Telephone Borrowers (8/31/1960)
Program Accounting
Uniform System of Accounts - Electric Program
RUS Uniform System of Accounts (10/28/24)
Water and Environmental
Water and Waste Facility Loans and Grants to Alleviate Health Risks Project Selection Criteria
Section 306C Water and Waste Disposal (WWD) Loans and Grants Transmittal Memorandum
Water Programs Emergency and Imminent Community Water Assistance Grants Project Selection Criteria (1/27/14)
Water Programs Emergency and Imminent Community Water Assistance Grants Transmittal Memorandum to Request Funds (1/27/14)
Water and Waste Project Selection Criteria
Letter For Use In Informing Private Lender of Agency's Commitment (3-20-00)
Letter For Use In Informing Private Lender of Agency's Commitment (Bonds) (Revised 3-20-00)
Water and Waste Loan/Grant Docket
Grant Agreement (Revised 1-27-14)
Review Guide for Water and Waste Audit Reports (Revised 4-21-00)
Daily Inspection Report
Water And Waste Letter Of Conditions
Preliminary Engineering Reports for the Water and Waste Disposal Program (4/4/13)
Bylaws
Eligibility Certification
Project Management Agreement Between The Regional Commission and RUS
Public Works Assisted By An Agency Loan (EDA)
Construction of Public Works and Development Facilities (EDA)
Guidance for the Use of Engineers Joint Contract Documents Committee (EJCDC) Bidding and Contract Documents on Water and Waste Disposal Projects with Rural Utilities Service Financial Assistance (Revised 5/10/24)
Loan Resolution Security Agreement (Revised 2-15-00)
2020 Poverty Guidelines (3-24-21)
Memorandum of Agreement between the Appalachian Regional Commission and the Rural Utilities Service
Guidance for Conducting Value Engineering Studies for Water and Waste Projects (Effective 3-21-2005)
Guidance for Using the Competitive Sealed Bids Process for the Water and Waste Disposal Program (Effective 9-5-2013)
Guidance for the Implementation of American Iron and Steel (AIS) Requirements with Rural Utilities Service Financial Assistance (Effective 8-30-2017)
Water And Waste Processing Checklist (Revised 8-7-2025)
Legal Services Agreement
Minimum Suggested Contents of Management Agreements
Water Users Agreement