Georgia Transmission Corporation proposes to construct the proposed Northeast Georgia Improvement Project. It includes the proposed East Walton-Rockville 500 kV Transmission Line, East Walton 500/230 kV Substation, East Walton-Bostwick 230 kV Transmission Line, Bostwick 230 kV Switching Station, East Walton – Jack’s Creek 230 kV Transmission Line, and East Walton – Bethabara #1-230 kV Transmission Line.
East Walton Plan
February 2025
East Central Georgia Reliability Projects Environmental Assessment - May 2025
Appendix A – Additional Report Figures - East Walton Ecology Figures | Substations Ecology Figures | Jacks Creek Ecology Figures
Appendix C – Summary of Routing and Siting Alternatives Analysis for the East Walton Plan
Appendix F-1 – Biological Assessment
Appendix F-2 – Conference Opinion (Pending)
Appendix F-3 –Additional Correspondence with Ga DNR
Appendix G – Programmatic Agreement
Alternatives Evaluation and Macro Corridor Study - April 2006
Scoping Report - June 2010