Notice of Availability to the RUS Badger State Solar
1. Notice of Intent (FR)
2. Alternatives Evaluation Study
3. Site Selection Study
Notice of Availability to the RUS Badger State Solar
Badger State Solar Environmental Impact Statement Draft
- Appendix A Badger State Scoping Report
- Appendix B Public Comments
- Appendix C EIS Distribution List
- Appendix D Final Badger State SSS 20210203 compressed
- Appendix E Revised Draft Badger State AES 20210624
- Appendix F Preliminary Geotechnical Report
- Appendix G HDD Inadvertant Release Control and Mitigation Plan
- Appendix H Preconstruction Sound Report
- Appendix I Wetland Delineation Report reduced
- Appendix J IPaC Species List and USFWS Consultation
- Appendix K Prime Farmland
- Appendix L Glare Hazard Analysis
- Appendix M Badger State Post Review Discovery Plan 20220211
- Appendix N Economic Impact Analysis