Arizona Electric Power Cooperative, Inc proposes to construct Gas Turbine 5 and 6 for power generation in Cochise, AZ. Two 42-megawatt (MW) simple cycle gas turbines ( the existing Apache Generating Station will be constructed and operated.
Apache Gas Turbine 5 and 6 Generation Project
Arizona Electric Power Cooperative