Construct, operate, maintain, and eventually decommission a 12-megawatt-hour (MWh) battery energy storage system (BESS), called the Sasabe-Arivaca Rural Microgrid Project (project), located within approximately 3 acres of State Trust land in Pima County, Arizona.
Sasabe-Arivaca Rural Migrogrid Project-AZ
Sasabe-Arivaca Rural Microgrid, LLC