The Elk Mound Solar Project is a proposed 2.5-megawatt solar photovoltaic facility located in Chippewa County, Wisconsin on land that has been previously disturbed for agriculture activities. The site is approximately 15 acres in size.
Staff Assignment Name: Alan Hachey
Project Submittal Date: 3/5/25
Project Approval Date: 3/10/25
DOE CE Applied: B5.16