Brief Project Description: Construction of a 2.25 MW-ac / 2.86MW-dc solar electric generation facility that will be sited on approximately 11 acres of previously disturbed hydrologically altered land.
Project Submittal Date: Feb 2025
Project Approval Date: May 2025
DOE CE Applied: B5.16