The project is a proposed 400-megawatt solar facility located on land that was previously disturbed for lignite mining. The project is located in Christine, Atascosa County, Texas.
Staff Assignment Name: Terry Czerwien
Project Submittal Date: 4/10/25
Project Approval Date: 7/21/25
DOE CE Applied: B5.16