Dairyland Power Cooperative proposes to rebuild 13 miles of the north segment of the Q-1 161 kV transmission line referred to as Q-1D line. The proposed project is located in Trempealeau and La Crosse counties, Wisconsin.
Notice of Availability of an Environmental Assessment - March 2015
- Environmental Assessment-Appendix C - March 2015
- Appendix D-E
- Appendix F1
- Appendix F2
- Appendix H1
- Appendix J-K
- Frequently Asked Questions - March 2015
- Construction Fact Sheet - March 2015