Cape Hatteras Electric proposes to construct the New Bonner Bridge 115 kV Line Relocation Project with substation improvements and 3.2 miles of transmission line. The proposed project is located in Dare County, New Jersey.
New Bonner Bridge Line Relocation - North Carolina
Cape Hatteras Electric Cooperative