Under the Rural Electrification Act of 1936, as amended, the Rural Utilities Service (RUS), is considering a request for loan financing from Seminole Electric Cooperative Inc. to construct a new 573-megawatt state-of-the-art, natural gas-fired 573 megawatt (MW) (winter), combined-cycle generating facility and associated 230-kV interconnection tie-line. The Shady Hills Combined Cycle Facility (SHCCF Project) is proposed for ~14 acres on land owned by Shady Hills Energy Center, L.L.C. (SHEC) in Shady Hills, Pasco County, Florida. The SHCCF Project will be constructed, owned, and operated by Shady Hills Energy Center, LLC (SHEC), a subsidiary of Seminole Electric Cooperative, Inc (Seminole).
- FINAL Environmental Assessment (EA)
- Seminole Electric Cooperative Inc. (Shady Hills Energy Center) Final EA
- Seminole Electric Cooperative Inc. (Shady Hills Energy Center) Final EA Appendices
- FONSI
- Notice of Availability (NOA)
- DRAFT Environmental Assessment (EA)