Georgia Transmission Corporation proposes to construct the proposed Northeast Georgia Improvement Project. It includes the proposed East Walton-Rockville 500 kV Transmission Line, East Walton 500/230 kV Substation, East Walton-Bostwick 230 kV Transmission Line, Bostwick 230 kV Switching Station, East Walton – Jack’s Creek 230 kV Transmission Line, and East Walton – Bethabara #1-230 kV Transmission Line.
Alternatives Evaluation and Macro Corridor Study - April 2006
Scoping Report - June 2010